Concrete
Minimum pitch
18 deg
Typical pitch
25 deg
Install rate
42
Service life
50 yr
Weight
48 kg
The default, and the heaviest. Large format means fewer units and faster laying, so the labour line falls even though the material line does not.
Every rate on this page is an install rate before tear off, complexity, scaffolding, waste and contingency. Put it through the estimator to see what a whole job in this material costs.
Open the estimator