Clay
Minimum pitch
35 deg
Typical pitch
40 deg
Install rate
58
Service life
60 yr
Weight
45 kg
Cheap per square metre and heavy. A roof that has carried concrete for forty years may need its timbers checked before clay goes back on, and that check is in nobody’s rate per square metre.
Every rate on this page is an install rate before tear off, complexity, scaffolding, waste and contingency. Put it through the estimator to see what a whole job in this material costs.
Open the estimator