footprint 120roof 146.5
Roof pitch
35°
More roof than ground+22.1%

You can measure the ground your house sits on. Nobody can measure a roof without a ladder, so we price from the footprint and the pitch.

You can measure the ground your house sits on. Nobody can measure a roof without a ladder, so we price from the footprint and the pitch.

Every roofer on this shelf asks you to ring for a price, or prints a rate per square metre that ignores tear off, scaffolding, waste and the shape of your roof. Both are ways of not answering. Drag the pitch above and watch the two numbers separate: that gap is the first thing a rate per square metre gets wrong, and it is not the largest.

The same roof, priced two ways

The same roof, priced two ways

A rate per square metre

8,497

8,497

146.5 m2 of roof at 58 a metre. This is the number a quote box gives you.

What the job invoices

13,598

13,598

The same roof with tear off, an 12 percent complexity uplift, scaffolding, waste removal and contingency.

Missing from the first figure

5,102

5,102

Sixty per cent. Not a rough guide that came out low: a different quantity.

Every figure on this page is produced by the estimator, at its own defaults. Change any of them and all three move.

Six lines, in the order they are added

Six lines, in the order they are added

Not one of these is optional and not one of them is in a rate per square metre. Each column is added to the one before it, so the last column is the price. The short bar underneath is where a rate per square metre stops.

Materials and labour

8,497

146.5 m2 at 58

Tear off

1,611

the old roof has to go somewhere

Complexity

1,213

hips, valleys, dormers, chimneys

Site costs

1,270

scaffolding and the skip

Contingency

1,007

what the felt hides until day two

Invoiced

13,598

13,598

the number you agree to

a rate per square metre reaches 8,497

The bar is drawn to scale: 62.5 per cent of the invoice. The missing 37.5 per cent is the five columns a rate per square metre does not have.

Put your own roof through it

The banner says 288 a month. It never says 17,295.

The banner says 288 a month. It never says 17,295.

Paying cash and paying monthly are not the same job at two prices. They are the same job at one price, plus a second and separate cost: the cost of borrowing. A finance banner leads with the smaller number and stops there, which is the trick a car advertisement runs. Both numbers are below, and the estimator prints them side by side on every job.

Cash price

13,598

13,598

What the job costs.

The banner figure

288 / mo

288 / mo

60 months at 9.9 per cent APR.

What you repay

17,295

17,295

288.25 a month, sixty times.

The cost of borrowing

3,697

3,697

27.2 per cent on top, on its own line.

A survey is free and it is the only way anybody can give you a real number.

A survey is free and it is the only way anybody can give you a real number.

Everything on this site is an estimate built from numbers you typed. What it cannot see is your roof: the state of the battens, whether the felt has gone, what is under the ridge, and whether the last person to work on it did it properly. Two hours on a ladder settles all four.

Create a free website with Framer, the website builder loved by startups, designers and agencies.